Hazard
|
Person(s) at Risk
|
Likelihood of Hazard
1 – Extremely Unlikely
5 – Extremely Likely
|
Severity of Hazard Outcomes
1 – Very Low Risk
5 – Very High Risk
|
Risk Level
(Likelihood + Severity)
2
|
Measures to Take to Manage Risk
|
Risk Managed?
Y/N
|
There is a bit of an uneven ground.
|
Billy and Ufuk
|
2
|
2
|
2
|
Make sure that everyone is aware of the ground and that we practise using it.
|
Yes
|
There is a possibility of a car coming due to the fact that there is a Gym and a shopping store right next to it.
|
Billy and Ufuk
|
2
|
3
|
2.5
|
Try not to leave the area within the back of the shop and always be aware of any vehicles.
|
Yes
|
There could be traffic coming out of the Gym and the shopping stores might be packed.
|
Billy and Ufuk
|
2
|
2
|
2
|
Just generally check for oncoming traffic that might be a risk of stopping us from recording.
|
Yes
|
Monday, 12 January 2015
Risk assessment sheet